The soft drink filling equipment is composed of QS washer, DG filler, FXZ capper connected by linear conveyor system, it is suitable for just trail started customer or which do not require high speed
This washer is developed on the basis of digesting and absorbing advanced technology introducing from abroad and is with international advanced level. It is mainly used for rising for 1st hand PET or glass bottles.It is advanced in construction , steadily in performance, safe in operation , easy in maintenance high in production efficiency, and the speed can be regulated infinitively. The rinser is the ideal choice for drink factories of small and middle size.
The bottles will be taken into rinser by conveyor, the dia plate will turn each bottle to be caught by spring clamp, with driven energy of motor, the spring clamps will go forward a circle along main axis, the bottles will be reversed 180°,bottle mouths will be facing to floor, and at the meantime, spray water value will be open and clean pressure water will spray inside bottles, with the water fall down, dirty inside bottles will be taken away. Then the cleaned bottle will be turned 180°again and sent into next machine station.
The whole machine is made of SUS304. The spring clamp is by Italian design, can be slightly adjustable according to bottle neck size difference and can protect bottle neck. And water spray system is from American, make sure water spray averagely. Easy for clean and maintenance.
Detailed photos:
This filler is developed on the basis of digesting and absorbing advanced technology introducing from abroad and is with international advanced level. It is mainly used for filling gas-containing drink, such as aerated water, cola sparkling wine , fruit tea and so on .It is advanced in construction , steadily in performance, safe in operation , easy in maintenance high in production efficiency, and the speed can be regulated infinitively. The filler is the ideal choice for drink factories of small and middle size.
Detailed photos:
The machine is used for capping for plastic screw caps, it includes auto cap loader and capping system 2 parts. Workers put bulk qty caps into cap loader, the cap loader will unscramble caps automatically and bring caps down in cap rail and then to capping head. Cap loader can hold more than 200pcs of caps each time, it will be convenient for adding caps often. When capping head catch cap, it will go down to bottle mouth and finish capping.
The capping head is by Italian magnetic technique, it will protect caps not to be destroyed. The capping correctness will be 99%. The opposite caps will be deleted automatically. The capping head is an separate part. Change cap is only need to change capping head, easy for change and operation. The whole machine is made from SUS304, long shelf time.
The following picture are the produced cabronated beverage by this model machine for ref:
Washing and Filling
1. the soft drink filling equipment is packed by wooden case.
2. The delivery date of soft drink filling equipment is within 30 days after payment.
mixing tank in the mixing part of the whole line
syrup melting tank in the mixing part of the whole line
Our machines are totally satisfied the requirements of CE certification:
The electrical motor in the whole filling line are all pasted with the sign of "Electric shock"
The wires in the machines are all in sealing treatment
Customer's service:
1. FILL-PACK company can provide turn-key project for you, only you have any idea to start beverage factory plant.
2. FILL-PACK company have professional design team, our engineer can draw bottle samples and flow chart ofworkshop for you .
3. FILL-PACK company give you the best quotation for all kinds of beverage production, only you can tell me whichkind of drink you want to product, what is your capacity(how many bottles one hour) what is you bottle material, pet or glass,etc
After service:
1. We send the engineers to help installing, commissioning and training, the engineers start from our factory area.
2. We supply below necessary documents with the machine:
a. Machine layout
b. Electricity diagram
c. Machine certificate
d. General manual book/maintenance book
3. After one year guarantee, the seller provides payable spare parts and technician’s VISITING maintenance service.
1.Why do you choose our factory?
There are many foreign guests cooperate with our company.We have enough experience and fund to provide you the high-quality products with the best price.
2.How long can you delivery?
About 30 days after we received the deposit(30%T/T in advance,70%T/T before shipment.)
3.How about your after-sale service?
One year repair for free Seller responsible for arrange engineer for installation and guide the workers of buyer how to operate and necessary repair,and give buyer a turnkey project.
4.How long can you finished the installation?
About 10-15 days.If the water and electricity is ready.If you have any questions,please do not hasitate to contact me.